In my last post I listed the steps that needed to be taken to put the top deck. I completed items 1-4 in my last post and in this post I will complete items 5-8 as listed below. Once completed, another scarf joint will need to be sanded and glued. The underside of the deck will then need to be coated with epoxy to seal it, and then the hull can be completed.
Add top stringersAttach support blocks and mast step supportAdd breather hole supportsPlane sides and level surface- Attach Pintiles
- Attach and bolt chain plate
- Coat inside with epoxy to seal wood
- Mark out document and measure where all supports are so that you remember where to attach hardware once the top is on


Chain plates and pintiles being fitted.

Sketch of internal blocks
Scarf joint being made



Scarf joint being glued.

Top deck being sealed. (Thanks Megan for all your help)



Attaching the deck with a million clamps!